Endeavour Hills Kitchen Refresh Project

We revamped a 90’s kitchen in a family home of 30yrs. Overall, the kitchen was in great condition so we didn’t alter the layout, this was more a budget cosmetic facelift to bring it into the 21st century.

We began in June, 2021 and finished in July, 2021. Awesome result for 4 weeks and the end result is simply INCREDIBLE so we had to share! 

  • The design brief: Modern/Traditional 
  • Time-frame: 2-4weeks
  • Project Management

What we did:

  • Resprayed cabinets - white on white
  • Installed Heritage iron handles
  • Installed Heritage black tap wear
  • Installed new stone benchtops

Our homeowners were left speechless at the transformation and what was able to be achieved in such a short timeframe and their budget.